PT. Citramegah Karya Gemilang ( CKG ) was established in 1990 to provide construction services to projects worldwide. CKG is a wholly owned Indonesian Company. Our management and key supervisory personnel have over 20 years of experience working in Indonesia and many other countries around the world. The wealth of experience gained by our staff working on nearly all major Islands of the Indonesian Archipelago assure successful project execution. All senior personnel have worked with major international contractors and clients throughout the world.
>> BONTANG LNG TR. G 1997 | ||
![]() |
On the east coast of Kalimantan Island in Indonesia, facing the Makassar strait, a gigantic LNG plant has been constructed in order to utilize the gasses produced in Badak, Nilam, Handil, Bekapai, Attaka, Tambora, Tunu, Semberah and Mutiala fields. P.T Badak Natural Gas Liquefaction Co, owned by Pertain, Huffco, Energy Systems and Japan Indonesia LNG, has been established and is now operating six LNG productions train with a total annual output of about 13 million metric tons. | |
Client: | Pertamina | |
Year of complection: |
A – D LPG Trains, Oct. 1998 E LNG / LPG Train, Dec. 1989 F LNG / LPG Train, Nov. 1993 |
>> AMOCO / MITSUI PTA 1997 | ||
![]() |
Fabrication and installation of underground and aboveground carbon steel, stainlees steel, high, medium,low pressure steam piping, titanium piping, FRP and PVC piping, compressor and equipment piping work, including pipe support fabrication and installation, NDE (x-ray) and testing. Scope of work includes supply off all consumable materials, direct and indirect manpower, supervision, construction equipment and temporary facilities etc. |
|
Name of Client | : Amoco / Mitsui | |
Type of Contract |
: Fixed Lump Sum/Unit Rate |
|
Duration | :22 Months (1995 - 1997) | |
Plant Site | : Merak, West Java | |
Project Title | : Amoco/Mitsui PTA Project, Merak | |
Main Contractor | : IKPT/ Chiyoda Corp. |
>> UNOCAL GEOTHERMAL POWER PLANT 1996 | ||
![]() |
Civil work including caisson digging, road crossing culverts, foundations for support, equipment, fabrication and installation of structural support, installation of equipment, piping, pipe testing, instruments work, insulation and painting. Scope of works includes supply of materials, direct and indirect manpower, supervision, consumables, tools, construction equipment and all material with the exception of piping materials and insulation, which were supplied by the client. | |
Name of Client | : UNOCAL |
|
Type of Contract |
: Fixed Lump Sum/Unit Rate |
|
Duration | : 9 months (Mar 1996 - Nov 1996) | |
Plant Site | : Gunung Salak, West Java |
|
Project Title | : UNOCAL Geothermal Power Project, Gunung Salak |
|
Main Contractor | : Fluor Daniel / IKPT |
> BONTANG LNG LOADING DOCK 1998 | ||
![]() |
This train is the fifth of the existing 4 trains (A,B,C,D) with the purpose of increasing the LNG production to meet with the worlds increasing demand for clean energy. |
|
Name of Client | : PT. Badak |
|
Type of Contract |
: Fixed Lump Sum/Unit Rate |
|
Duration | : 20 months (1997-1998) |
|
Plant Site | : Bontang, East Kalimantan |
|
Project Title | : Bontang LNG Expansion Train-G, 3rd Loading Dock |
|
Main Contractor | : IKPT/ Chiyoda Corp. |
>> BONTANG LNG DEBOTTLENECKING 1999 | ||
![]() |
CKG constructed the seawater intake structure, all of the civil and building works, piping and mechanical works associated with this major debottlenecking project for trains A thru D at Bontang LNG. |
|
Name of Client | : PT. Badak |
|
Type of Contract |
: Fixed Lump Sum/Unit Rate |
|
Duration | : 4 Months (July 1999-Oct 1999) |
|
Plant Site | : Bontang, East Kalimantan |
|
Project Title | : Train E Debottlenecking Project, Bontang LNG Plant Under PT. Badak Contract |
|
Main Contractor | : CII |
>> CALTEX SUMATERA DURI STEAM FLOOD PROJECT 2002 | ||
![]() |
This is part of indonesia largest oil field development project, operated by Caltex. CKG is working on earthwork involving some two million cubic meters and infield piping project. |
|
Name of Client | : Caltex |
|
Type of Contract |
: Fixed Lump Sum/Unit Rate |
|
Duration | : 22 Months (1995 - 1997) |
|
Plant Site | : Duri, Riau |
|
Project Title | : Caltex Sumatera Duri Steamfold Project |
|
Main Contractor | : IKPT |
>> BCD PROJECT / PERMANENT CAMP FACILITIES 2005 | ||
![]() |
||
Name of Client | : Petrochina International |
|
Type of Contract |
: Fixed Lump Sum/Unit Rate |
|
Duration | : 24 Months (2003 - 2005) |
|
Plant Site | : Tanjung Jabung, Jambi |
|
Project Title | : Betara Complex Development (BCD) Project, Jambi |
|
Main Contractor | : Chiyoda Corp/CII/ SembCorp/PT. Sempec |
>> NIAS 15 MW RENTAL DIESEL POWER PLANT PROJECT | ||
![]() |
||
Name of Client | : PT. PLN (Indonesia Goverment Electricty Company) | |
Duration |
: 3 Months |
|
Plant Site |
: Gunung Sitoli, Nias, North Sumatera |
|
Capacity | : 15 MW Diesel Power Plant |
>> PADANG 40 MW RENTAL DIESEL POWER PLANT PROJECT | ||
![]() |
||
Name of Client | : PT. PLN (Indonesia Goverment Electricty Company) | |
Duration |
: 3 Months |
|
Plant Site |
: Pauh Limo,Padang, West Sumatera |
|
Capacity | : 40 MW Diesel Power Plant |
>> MEDAN 75 MW RENTAL DIESEL POWER PLANT PROJECT | ||
![]() |
||
Name of Client | : PT. PLN (Indonesia Goverment Electricty Company) | |
Duration |
: 3 Months |
|
Plant Site |
: Kuala Namu,Medan, North Sumatera |
|
Capacity | : 75 MW Diesel Power Plant |
>> BANYU URIP EPC-5 PROJECT | ||
![]() |
||
Name of Client | : Mobil-Cepu Ltd | |
Main Contractor |
: PT.Wijaya Karya |
|
Plant Site |
: Luwuk, Central Sulawesi |
|
Scope of Work | : Piping, Mechnical, Steel Structure Installation |